Update – New rock placed above front windows
Necia Seamons
December 27, 2011
|
New blocks of stone sit above the Oneida Stake Academy’s front windows, in preparation for the new gable which will be installed at the first of 2012. In addition, new blocks cut from stone taken from the academy’s original quarry, have replaced highly deteriorated stone. As funds are raised, craftsmen from State Stone of Salt Lake City, Utah, will replace all severely deteriorated stone on the building, such as those at the bottom left of this picture. |